I had the septic system install at the tail end of last year. It snowed during the install so I never got to see the results. My Buddy and lot this neighbour Lyle went up to check it out on Thursday. While I was there I staked out the approximate locations of the two A-frames. Plan is to do the smaller a-frame (SOLO100+) first. That will give me time to prep and save for the second A-frame which is a larger more complicated build.
0 Comments
Leave a Reply. |
AuthorEngineer dad of twins. Building cottage, feeding kids, lots of wood and electrical solar projects. Before life, business & kids intervened, I travelled to 97 countries. Archives
May 2022
Categories |